Heathrow_T5

Heathrow Terminal 5

Background: PTSG was commissioned by Heathrow maintenance contractor, Carillion, to upgrade eight monorail-based cleaning systems on the Terminal 5 building.

Results: Used by 28.1 million passengers every year, Heathrow’s iconic Terminal 5 is one of London’s busiest buildings. The largest free-standing building in the UK, its glass facades are cleaned using eight monorail-based cleaning cradles. Maintenance contractor, Carillion, commissioned PTSG to remove, overhaul and replace all eight systems and provide all necessary re-commissioning work and insurance checks.

The location, at one of the world’s busiest airport terminals, placed a number of constraints on the work. To avoid peak passenger times, work could only take place in the early mornings between 1am and 4am; and because of the location of the equipment in high-security areas, only BAA-certified engineers were permitted to carry out the work.

With such a small time window in which to work, PTSG back room staff played a key role in providing clear and concise instructions to engineers, arranging permits and carrying out risk assessments in advance. Despite these challenges, the project was successfully completed within three weeks.

ACCESS & SAFETY
ELECTRICAL SERVICES
BUILDING ACCESS SPECIALISTS
FIRE SOLUTIONS

ACCESS & SAFETY

Safety Testing Safety Installation Cradle Maintenance Cradle Installation

ELECTRICAL SERVICES

Lightning Protection Surge Protection Specialist Earthing Electrical Testing

BUILDING ACCESS SPECIALISTS

Steeplejack Services High-Level Installations High-Level Reparation High-Level Cleaning

FIRE SOLUTIONS

Dry Risers Sprinkler Systems Fire Alarm/Emergency Lighting Fire Extinguishers

ACCREDITATIONS


Terms and Conditions | Privacy & Cookie Policy