Welcome to PTSG Access and Safety Ltd In safe hands

Provision, testing and certification of critical access and safety systems

Providence Tower

pt1

Date: 2014 – 2015
Address: Canary Wharf, London
Client: Balfour Beatty

Balfour Beatty are constructing the 43-storey Providence Tower residential scheme, within a build contract in excess of £110 million. The project will deliver 343 residential units within the tower, with 141 units located within the 12-storey curved podium adjoining the tower.

On the tallest tower Balfour Beatty has ever built, they have handed the responsibility to provide access equipment onto PTSG. We are providing a static BMU with a telescopic jib with a 4-stage reach of 20.85m. The BMU has been designed to fit away from sight in the small parking space provided. This project will be an engineering success for Integral Cradles and their Spanish sole supply partner, GinD.

In addition to the BMU, PTSG will provide a number of safety lines on the various roofs, to provide safe access to unprotected areas of the roof.

ACCESS & SAFETY
ELECTRICAL SERVICES
BUILDING ACCESS SPECIALISTS
FIRE SOLUTIONS

ACCESS & SAFETY

Safety Testing Safety Installation Cradle Maintenance Cradle Installation

ELECTRICAL SERVICES

Lightning Protection Surge Protection Specialist Earthing Electrical Testing

BUILDING ACCESS SPECIALISTS

Steeplejack Services High-Level Installations High-Level Reparation High-Level Cleaning

FIRE SOLUTIONS

Dry Risers Sprinkler Systems Fire Alarm/Emergency Lighting Fire Extinguishers

ACCREDITATIONS


Terms and Conditions | Privacy & Cookie Policy