Welcome to PTSG Access and Safety Ltd In safe hands

Provision, testing and certification of critical access and safety systems

HSBC Tower, Canary Wharf, London

Date: 2015
Address: Canary Wharf, London
Client: Mace / Overbury / HSBC

The BMU’s on the iconic HSBC Tower, 8 Canada Square are to be removed and replaced by Integral Cradles Ltd.

Working with MACE, Overbury and HSBC, we will remove the existing redundant equipment and replace with two newly manufactured units – all to be installed and commissioned without the use of a tower crane but assembled through the building without any disruption to the day to day workings of this live building. Design and logistics works are currently underway with an installation starting in early January 2015.

ACCESS & SAFETY
ELECTRICAL SERVICES
BUILDING ACCESS SPECIALISTS
FIRE SOLUTIONS

ACCESS & SAFETY

Safety Testing Safety Installation Cradle Maintenance Cradle Installation

ELECTRICAL SERVICES

Lightning Protection Surge Protection Specialist Earthing Electrical Testing

BUILDING ACCESS SPECIALISTS

Steeplejack Services High-Level Installations High-Level Reparation High-Level Cleaning

FIRE SOLUTIONS

Dry Risers Sprinkler Systems Fire Alarm/Emergency Lighting Fire Extinguishers

ACCREDITATIONS


Terms and Conditions | Privacy & Cookie Policy