Welcome to PTSG Access and Safety Ltd In safe hands

Provision, testing and certification of critical access and safety systems

Aston University, Phase 2, Birmingham

Date: 2012 – 2013
Address: Birmingham
Client: BAM Construction / Aston University / Lewis & Hickey Architects

Integral Cradles Ltd secured this significant order during 2012 to provide all the bespoke access systems on the Lewis & Hickey Architects’ designed Phase 2 of Aston University. The new scheme consists of four residential blocks providing 2400 en-suite student bedrooms as well as ancillary accommodation such as common and games facilities.

The project is part of Aston University’s £214m investment in accommodation that will ensure high quality, well-maintained rooms on campus for many years to come.

The façade access equipment provided consists of two fully powered BMUs with a fixed jib reach and a pair of removable Davits providing access to all external facades. The BMU functions include powered traversing, powered slewing body and jib head, and incorporates a lifting beam with a safe working load of 300kgs.

ACCESS & SAFETY
ELECTRICAL SERVICES
BUILDING ACCESS SPECIALISTS
FIRE SOLUTIONS

ACCESS & SAFETY

Safety Testing Safety Installation Cradle Maintenance Cradle Installation

ELECTRICAL SERVICES

Lightning Protection Surge Protection Specialist Earthing Electrical Testing

BUILDING ACCESS SPECIALISTS

Steeplejack Services High-Level Installations High-Level Reparation High-Level Cleaning

FIRE SOLUTIONS

Dry Risers Sprinkler Systems Fire Alarm/Emergency Lighting Fire Extinguishers

ACCREDITATIONS


Terms and Conditions | Privacy & Cookie Policy